« September 2009 | Main | December 2009 »

November 30, 2009

and then there were two...

we spent black friday day at home depot and laying the t&g subflooring for cabin #2

saturday and sunday had us busy with framing and some sheathing.

cedar pergola for porch of cabin #1 is taking shape.

these two girls worked hard this weekend!  I had hoped to get the roofing up before the rain started last night.  we finally gave up as we ran out of batteries.  we did manage to cover up the OSB with plastic sheeting before taking off for a few days.

we now have cabina azul and cabina verde!

came home and applied LED lights to our new made in china fake christmas tree.


[ Yahoo! ] options

November 23, 2009

R30-ish

I cut down the old construction door from austinmodhouse to fit the cabin.  testing paint colors and we are not settled on this cranberry, looks a bit too much like purple.  also have decided to paint the hardie that is up high around that window in white. 

 r-30

kat worked hard at applying insulation.

the inside really feels like being indoors!  she is ready to start the finish details and get it cleaned up.  I have it prewired for LED lights and have a small AGM battery to power them (will be charged via solar)

mount baldy- wimberley 

we set off to climb mount baldy, a few blocks from our cabin.

that was a steep climb up, especially with a toddler on me.

our cabin is among those trees down there, just beyond those buildings.


[ Yahoo! ] options